A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system

Ibrahim, Zarina (2014) A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system. Masters thesis, Universiti Tun Hussein Onn Malaysia.

[img]
Preview
Text
24p ZARINA IBRAHIM.pdf

Download (1MB) | Preview
[img] Text (Copyright Declaration)
ZARINA IBRAHIM COPYRIGHT DECLARATION.pdf
Restricted to Repository staff only

Download (480kB) | Request a copy
[img] Text (Full Text)
ZARINA IBRAHIM WATERMARK.pdf
Restricted to Registered users only

Download (3MB) | Request a copy

Abstract

The advancement of technology had encouraged mankind to design and create useful equipment and devices. These equipment enable users to fully utilize them in various applications. Pulp mill is one of the heavy industries that consumes large amount of electricity in its production. Due to this, any malfunction of the equipment might cause mass losses to the company. In particular, the breakdown of the generator would cause other generators to be overloaded. In the meantime, the subsequence loads will be shed until the generators are sufficient to provide the power to other loads. Once the fault had been fixed, the load shedding scheme can be deactivated. Thus, load shedding scheme is the best way in handling such condition. Selected load will be shed under this scheme in order to protect the generators from being damaged. Multi Criteria Decision Making (MCDM) can be applied in determination of the load shedding scheme in the electric power system. In this thesis two methods which are Analytic Hierarchy Process (AHP) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) were introduced and applied. From this thesis, a series of analyses are conducted and the results are determined. Among these two methods which are AHP and TOPSIS, the results shown that TOPSIS is the best Multi criteria Decision Making (MCDM) for load shedding scheme in the pulp mill system. TOPSIS is the most effective solution because of the highest percentage effectiveness of load shedding between these two methods. The results of the AHP and TOPSIS analysis to the pulp mill system are very promising.

Item Type: Thesis (Masters)
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1001-1841 Production of electric energy or power. Powerplants. Central stations
Divisions: Faculty of Electrical and Electronic Engineering > Department of Electrical Engineering
Depositing User: Mrs. Sabarina Che Mat
Date Deposited: 04 Oct 2021 08:45
Last Modified: 04 Oct 2021 08:45
URI: http://eprints.uthm.edu.my/id/eprint/1709

Actions (login required)

View Item View Item