Project management scheduling through integrated PERT and Gantt Chart

Ahmad, Siti Hasziani and Bon, Abdul Talib and Raja Mohd Rasi, Raja Zuraidah and Sie-Long, Kek (2013) Project management scheduling through integrated PERT and Gantt Chart. In: 1st FPTP Postgraduate Seminar 2013, 23 December 2013, Fakulti Pengurusan Teknologi dan Perniagaan, UTHM .

[img]
Preview
PDF
356Kb

Abstract

In project management, scheduling is one of the important activities, where the project can be successfully finished within a desired time period. This study reviews the existing techniques in solving the scheduling problems. An integration technique between Program Evaluation and Review Technique (PERT), and Gantt chart is proposed for a better scheduling such that the efficiency of the proposed approach and the existing techniques can be compared. Data collection was carried out and the previous monthly data of the production was taken. After collecting data, the data will be transformed into PERT diagram and then the duration time and cost of the production were calculated. Consequently, the Gantt chart of the production was developed. As a result, an optimal scheduling can be suggested in future.

Item Type:Conference or Workshop Item (Paper)
Uncontrolled Keywords:PERT; gantt chart; integration; project management; scheduling
Subjects:H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
Divisions:Faculty of Technology Management and Business > Department of Production and Operation
ID Code:5790
Deposited By:Normajihan Abd. Rahman
Deposited On:01 Sep 2014 14:49
Last Modified:01 Sep 2014 14:49

Repository Staff Only: item control page