UTHM Institutional Repository

Load shedding scheme in large pulp mill by using analytic hierarchy process

H., H. Goh and B., C. Kok and S., W. Lee and A. A., Mohd Zin Load shedding scheme in large pulp mill by using analytic hierarchy process. In: Global Conference on Power Control and Optimization, 2-4 December 2010, Kuching, Malaysia.

[img]
Preview
PDF
Goh_hui_huang_FKEE_(PCO2010).pdf

Download (234kB)

Abstract

Pulp mill is one of the heavy industries that consumes large amount of electricity in its production. In particular, the breakdown of the generator would cause other generators to be overloaded. Thus, load shedding scheme is the best way in handling such condition. Selected load will be shed under this scheme in order to protect the generators from being damaged. In the meantime, the subsequence loads will be shed until the generators are sufficient to provide the power to other loads. In order to determine the sequences of load shedding scheme, analytic hierarchy process (AHP) is introduced. Analytic Hierarchy Process is one of the multi-criteria decision making methods. By using this method, the priority of the load can be determined. This paper presents the theory of the alternative methods to choose the load priority in load shedding scheme for a large pulp mill.

Item Type: Conference or Workshop Item (Paper)
Uncontrolled Keywords: analytic hierarchy Process (AHP); expert choice; load shedding; pulp mill
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1001-1841 Production of electric energy or power. Powerplants. Central stations
Divisions: Faculty of Electrical and Electronic Engineering > Department of Electrical Power Engineering
Depositing User: Normajihan Abd. Rahman
Date Deposited: 05 Oct 2011 07:42
Last Modified: 05 Oct 2011 07:42
URI: http://eprints.uthm.edu.my/id/eprint/2051
Statistic Details: View Download Statistic

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year