Examining factors affecting budget overrun of construction projects undertaken through management procurement method using PLS-SEM approach

Abdul Rahman, Ismail and Memon, Aftab Hameed and Abd Karim, Ahmad Tarmizi (2013) Examining factors affecting budget overrun of construction projects undertaken through management procurement method using PLS-SEM approach. In: Evaluation of Learning for Performance Improvement International Conference, 25 - 26 February, 2013, Malaysia. (Unpublished)

[img]
Preview
PDF
ELPIIC_2013_1.pdf

Download (475kB)

Abstract

This study focused on examining the effect of various factors on budget overrun in construction projects undertaken with management procurement method in Malaysia. It adopted a quantitative method for data collection using structured questionnaire sumey amongst contractors, consultant and clients. A total of 118 samples were collected against 200 questionnaires that had been distributed nationwide. Gathered data was analyzed with an advanced multivariate method of structural equation modeling with PLS approach using SmartPLS software. The major finding shows all the constructs in model contribute significantly to budget overrun with R' value of 0.623. Also, the developed model has substantial explain power with GoF value of 0.62. This indicates that the model is able to be generalized in representing the budget overrun factors occurring in construction projects nationwide. By identifying these factors, it will help the construction community to take measures in improving the cost performance of the projects.

Item Type: Conference or Workshop Item (Paper)
Subjects: T Technology > TH Building construction > TH1-844 Building construction
Depositing User: Normajihan Abd. Rahman
Date Deposited: 08 Aug 2018 07:49
Last Modified: 04 Nov 2019 02:45
URI: http://eprints.uthm.edu.my/id/eprint/3703
Statistic Details: View Download Statistic

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year