Study of factors causing time and cost overrun throughout life cycle of construction project

Ismail, Ismaaini and Abdul Rahman, Ismail and Memon, Aftab Hameed (2013) Study of factors causing time and cost overrun throughout life cycle of construction project. In: Malaysian Technical Universities Conference on Engineering & Technology (MUCET) , 3-4 December 2013, Kuantan, Pahang.

[img] PDF
2013_Factors_of_Time_and_Cost_Overrun_with_Life_Cycle_(MUCET2013)_-.pdf

Download (146kB)

Abstract

This paper presents a study of factors affecting time and cost overruns throughout life cycle of construction projects. The issues of overrun in construction are very common worldwide including Malaysia. However, no researchers investigate this problem according to the phases of construction. Hence, this study is to classify the overrun factors into phases of project life cycle which include planning phase, design phase, construction phase and finishing phase. A total of 35 factors were identified based on previous studies involving a number of different countries. These factors were classified according to degree of occurrence of each phase. Based on this classification, it shows that most of the factors occurred in construction phase. This classification gives better understanding amongst construction practitioners.

Item Type: Conference or Workshop Item (Paper)
Uncontrolled Keywords: time and cost overruns; projects life cycle; construction project; Malaysia
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA630-695 Structural engineering (General)
Divisions: Faculty of Civil and Environmental Engineering > Department of Civil Engineering Technology
Depositing User: Normajihan Abd. Rahman
Date Deposited: 27 Feb 2014 04:00
Last Modified: 21 Jan 2015 07:19
URI: http://eprints.uthm.edu.my/id/eprint/5024
Statistic Details: View Download Statistic

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year