Relevancy of factors and mitigation measures in controlling time and cost overrun towards Malaysian Environment

Roslan, Nadzirah and Zainun, Noor Yasmin and Memon, Aftab Hameed (2015) Relevancy of factors and mitigation measures in controlling time and cost overrun towards Malaysian Environment. Applied Mechanics and Materials , 773 (2015). pp. 1007-1011. ISSN 1660-9336

[img] PDF
noor_yasmin_zainun_U_3.pdf

Download (271kB)

Abstract

Construction projects are facing time and cost overrun globally. Since, this problem occurs due to various factors, hence for achieving successful construction projects, it is very important to control the responsible factors causing time and cost overrun. This study assessed the relevancy for each mitigation measures in relation with causative factors of time and cost overrun in Malaysian construction projects. A total of 56 mitigation measures were identified and correlated with the critical factors of time and cost overrun which were categorized into four phases of project life cycle. Data collection was done by conducting structured interviews amongst the experienced practitioners of the southern regions of Peninsular Malaysia.

Item Type: Article
Uncontrolled Keywords: time overrun; cost overrun; mitigation measure
Subjects: T Technology > TH Building construction > TH1-844 Building construction
Divisions: Faculty of Civil and Environmental Engineering > Department of Construction Engineering and Architecture
Depositing User: Normajihan Abd. Rahman
Date Deposited: 20 Aug 2015 03:22
Last Modified: 20 Aug 2015 03:22
URI: http://eprints.uthm.edu.my/id/eprint/6997
Statistic Details: View Download Statistic

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year