Water business - public private partnership in rural Bangladesh

Kamruzzaman, A. K. M. and Said, Ilias and Osman, Omar and Hasmori, Muhammad Fikri (2012) Water business - public private partnership in rural Bangladesh. In: 3rd International Conference on Business and Economic Research (ICBER 2012), 12-13 March 2012, Bandung, Indonesia.

Full text not available from this repository.

Abstract

This paper reports the lesson learnt fromfirst phase pilot rural piped water supply schemes implemented using Public-Private -Partnership (PPPj in rural villages of Bangladesh. Data was collected by semi structured interview of implementing agencies representatives. Non-Government Organizations (NGOs) participated as sponsor and contributed capital cost of 40% of the scheme cost. NGO's were responsible for selecting the villoges, conducting the feosibility study, preparing the project proposal cum business plan and constructing the infrastructure with the assistance of Social development Foundation (SDF), an autonomous Government Organization. Project sponsors agreed to operote the schemes for 15 years ond recoup operating ond capital cost through collecting woter tariff. Schemes completion takes lowest 14 months to highest 60 months, whereas, standard completion period is only 12 month. Most alarming findings ore low numbers of house connections in all the schemes then estimated in the business plon. As a result sponsors financial sustainability was in volatile shape initially. Encouragingly gradually house connections are increasing with time. One of the schemes achieved 90% connection. In light of the outputs of the pilot schemes, this effort mode some recommendotions for the smooth implementotion of future PPP projects in infant sector like rural piped water supply

Item Type: Conference or Workshop Item (Paper)
Uncontrolled Keywords: public private partnership; piped watersupply; project management; sustainability
Subjects: T Technology > T Technology (General)
Divisions: Faculty of Civil and Environmental Engineering > Department of Construction Engineering and Architecture
Depositing User: Mrs. Nurhayati Ali
Date Deposited: 13 Aug 2018 03:38
Last Modified: 13 Aug 2018 03:38
URI: http://eprints.uthm.edu.my/id/eprint/8333
Statistic Details: View Download Statistic

Actions (login required)

View Item View Item