Items where Author is "Memon, Aftab Hameed"

Up a level
Export as [feed] RSS 2.0 [feed] RSS 1.0 [feed] Atom
Group by: Item Type | No Grouping
Number of items: 21.

Article

Roslan, Nadzirah and Zainun, Noor Yasmin and Memon, Aftab Hameed (2015) Relevancy of factors and mitigation measures in controlling time and cost overrun towards Malaysian Environment. Applied Mechanics and Materials , 773 (2015). pp. 1007-1011. ISSN 1660-9336

Memon, Aftab Hameed and Rahman, I. A. and Abdul Azis, Ade Asmi (2014) Assessing causal relationships between construction resources and cost overrun using PLS path modelling focusing in southern and central region of Malaysia. Journal of Engineering and Technology, 4 (1). ISSN 2180-3811

Abdul Rahman, Ismail and Memon, Aftab Hameed and Mohd Zulkifli, Nora Sheda (2014) Failure reasons of PPP infrastructure projects: case study of Kuala Lumpur LRT Project. Life Science Journal, 11 (7). pp. 238-246. ISSN 1097-8135

Memon, Aftab Hameed and Abdul Rahman, Ismail and Abdul Aziz, Ade Asmi (2014) The cause factors of large project's cost overrun: a survey in the southern part of Peninsular Malaysia. International Journal of Real Estate Studies (INTREST), 7 (2).

Abdul Rahman, Ismail and Memon, Aftab Hameed and Abdul Azis, Ade Asmi and Abdullah, Nor Hazana (2013) Modeling causes of cost overrun in large construction projects with partial least square-SEM approach: contractor's perspective. Research Journal of Applied Sciences, Engineering and Technology, 5 (6). pp. 1963-1972. ISSN 2040-7467

Abdul Rahman, Ismail and Memon, Aftab Hameed and Abdul Karim, Ahmad Tarmizi (2013) Relationship between factors of construction resources affecting project cost. Modern Applied Science, 7 (1). ISSN 1913-1852

Abdul Rahman, Ismail and Memon, Aftab Hameed and Abdul Karim, Ahmad Tarmizi (2013) Significant factors causing cost overruns in large construction projects in Malaysia. Journal of Applied Science, 13 (2). pp. 286-293. ISSN 1812-5654 (print) / 1812-5662 (online)

Memon, Aftab Hameed and Abdul Rahman, Ismail and Abdul Azis, Ade Asmi (2011) Preliminary study on causative factors leading to construction cost overrun. International Journal of Sustainable Construction, 2 (1). pp. 1-15. ISSN 21803242

Memon, Aftab Hameed and Abdul Rahman, Ismail and Abdullah, Mohd Razaki and Abdul Aziz, Ade Asmi (2011) Time overrun in construction projects from the perspective of Project Management Consultant (PMC). Journal of Surveying, Construction and Property (JSCP), 2 (1). ISSN 1985-7527

Book

Abdul Rahman, Ismail and Memon, Aftab Hameed and Ahmad Zaidi, Ahmad Mujahid (2011) Introduction to lean construction. Penerbit UTHM. ISBN 978-983-5457-56-2

Conference or Workshop Item

Abdul Rahman, Ismail and Akhir, Nor Solehah and Memon, Aftab Hameed and Nagapan, Sasitharan (2014) Risk level of factor contributing to waste generation in construction phase. In: InCIEC 2014 International Civil and Infrastructure Engineering Conference, 28 September – 1 October 2014, Kota Kinabalu, Sabah, Malaysia.

Memon, Aftab Hameed and Abdul Rahman, Ismail and Ismail, Ismaaini and Zainun, Noor Yasmin (2014) Time management practices in large construction projects. In: 2014 IEEE Colloquium on Humanities, Science and Engineering Research (CHUSER 2014), 7-9 April 2014, Penang, Malaysia.

Ismail, Ismaaini and Abdul Rahman, Ismail and Memon, Aftab Hameed (2013) Study of factors causing time and cost overrun throughout life cycle of construction project. In: Malaysian Technical Universities Conference on Engineering & Technology (MUCET) , 3-4 December 2013, Kuantan, Pahang.

Ismail, Ismaaini and Abdul Rahman, Ismail and Memon, Aftab Hameed and Abdul Karim, Ahmad Tarmizi (2013) Comparative study on time management practices in construction industry between Kedah and Kelantan. In: Proceedings the 2nd International Conference on Global Optimization and Its Applications 2013 (ICoGOIA2013), 28-29 August 2013, Melaka, Malaysia .

Md Akhir, Nor Solehah and Abdul Rahman, Ismail and Memon, Aftab Hameed and Nagapan, Sasitharan (2013) Factors of waste generation throughout construction life cycle. In: Malaysian Technical Universities Conference on Engineering & Technology (MUCET) , 3-4 December 2013, Kuantan, Pahang.

Roslan, Nadzirah and Memon, Aftab Hameed and Zainun, Noor Yasmin (2013) Indicators of low-cost housing demand in Malaysia. In: Malaysian Technical Universities Conference on Engineering & Technology (MUCET) , 3-4 December 2013, Kuantan, Pahang.

Memon, Aftab Hameed and Abdul Rahman, Ismail and Zainun, Noor Yasmin and Abdul Karim, Ahmad Tarmizi (2013) Web-based risk assessment technique for time and cost overrun (WRATTCO) – a framework. In: 2nd International Conference on Innovation, Management and Technology Research (ICIMTR 2013) , 22-23 September 2013, Universiti Malaysia Kelantan .

Nagapan, Sasitharan and Abdul Rahman, Ismail and Asmi, Ade and Memon, Aftab Hameed and Latif, Imran (2012) Issues on construction waste: the need for sustainable waste management. In: 2012 IEEE Colloquium on Humanities, Science & Engineering Research (CHUSER 2012), 3-4 December 2012, Kota Kinabalu, Sabah.

Abdul Rahman, Ismail and Memon, Aftab Hameed and Nagapan, Sasitharan and Imran Latif, Qadir Bux Alias and Abdul Azis, Ade Asmi (2012) Time and cost performance of construction projects in Southern and Central Regions of Peninsular Malaysia. In: 2012 IEEE Colloquium on Humanities, Science & Engineering Research (CHUSER 2012), 3-4 December 2012, Kota Kinabalu, Sabah.

Memon, Aftab Hameed and Abdul Rahman, Ismail and Abdullah, Mohd Razaki and Abdul Azis, Ade Asmi (2011) Assessing the effects of construction delays on MARA large projects. In: International Conference on Advanced Science, Engineering and Information Technology 2011, 14-15, January 2011, Hotel Equatorial Bangi-Putrajaya.

Thesis

Memon, Aftab Hameed (2013) Structural modelling of cost overrun factors in construction industry. PhD thesis, Universiti Tun Hussein Onn Malaysia.