Noise assessment at construction site which uses IBS formwork system

Abas, Nor Haslinda and Mohd Ta’at, Nurul Hasanah and Hasmori, Muhammad Fikri and Abdullah, Abd.Halid and Nagapan, Sasitharan and Deraman, Rafikullah and Yean, Ghing Tong and Hardono, Setiawan (2018) Noise assessment at construction site which uses IBS formwork system. Asian Journal of Technical Vocational Education And Training (AJTVET), 4. pp. 33-41. ISSN 0128-0600

[img] Text
AJ 2018 (418).pdf
Restricted to Registered users only

Download (779kB) | Request a copy

Abstract

This study measures the noise level that construction workers are exposed to at construction site while performing the activities in the construction of building envelop at Putrajaya, which uses IBS formwork system as a construction method. This study involved three phases, in-line with the research objective. The first phase involved identifying the process involved in the construction of building envelop together with the potential associated noise hazards. This was done through field and interview with the project personnel. The second phase involved assessing the noise exposure for affected activities using Sound Level Meter (SLM). Next, the noise profile is plotted throughout the construction stage (Phase III). Informal interview was also conducted with the workers who exposed to the high noise to know whether the noise exposure while doing works affect their health. The analysis showed that, even though the average highest level of noise recorded was 103.8dB (at 1m distance), the workers were not exposed to the level of noise of more than 115dB at the selected construction site. This means that, for this particular construction site, the level of noise that the workers are exposed to while working will not endanger them in a short period of time.

Item Type: Article
Uncontrolled Keywords: IBS, formwork system; noise assessment; noise at construction site
Subjects: T Technology > T Technology (General)
T Technology > TH Building construction > TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction
Divisions: Faculty of Civil Engineering and Built Environment > Department of Architecture
Depositing User: UiTM Student Praktikal
Date Deposited: 02 Dec 2021 02:38
Last Modified: 02 Dec 2021 02:38
URI: http://eprints.uthm.edu.my/id/eprint/4298

Actions (login required)

View Item View Item