The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay

Karunakaran, Priyadatchini (2020) The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay. Doctoral thesis, Universiti Tun Hussein Onn Malaysia.

[img]
Preview
Text
24p PRIYADATCHINI KARUNAKARAN.pdf

Download (3MB) | Preview
[img] Text (Copyright Declaration)
PRIYADATCHINI KARUNAKARAN COPYRIGHT DECLARATION.pdf
Restricted to Repository staff only

Download (3MB) | Request a copy
[img] Text (Full Text)
PRIYADATCHINI KARUNAKARAN WATERMARK.pdf
Restricted to Registered users only

Download (4MB) | Request a copy

Abstract

Project performance can be enhanced via proper risk management, particularly with the development of risk response measures. Though delay issues have been explored in many studies, to date, no study has attempted to measure how delay factors and risk measures are associated with the project performance. Therefore, the aim of this study is to establish the framework of the direct and indirect effect of project risk response�related measures (RM) on project performance (PP) in managing project-related delay factors (DF) in Malaysian construction companies. A total of 332 questionnaire responses were collected from Grade 7 contractors via posts, online survey, email, and by hand. The data was examined using Statistical Package of Social Sciences and Structural Equation Modelling. The result of the study showed that all RMs have significant effect on time and cost performance, except for corrective-related measures and their effect on time performance. Both the DF and RM have a significant effect on PP. Also, the mediating effect was found to be significant on PP. This research provides guidelines for construction practitioners and decision makers on identifying critical delay issues and ways to deal with it with effective risk response measures in order to enhance the project performance. This research also benefits the researchers to have a clear view of the theoretical parts and comprehensive analyses in dealing with delays in the construction industry. This research highly recommends the researchers to further explore on risk behaviour from a different point of views to understand a firm’s intention in mitigating risk.

Item Type: Thesis (Doctoral)
Subjects: T Technology > TH Building construction > TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction
Divisions: Faculty of Civil Engineering and Built Environment > Department of Civil Engineering : Building and Construction Engineering
Depositing User: Mrs. Sabarina Che Mat
Date Deposited: 09 Sep 2021 06:06
Last Modified: 09 Sep 2021 06:06
URI: http://eprints.uthm.edu.my/id/eprint/941

Actions (login required)

View Item View Item