Items where Author is "Cheam, Kai Wen"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Jump to: Book Section
Number of items: 7.

Book Section

Mohd Nor, Norasmiha and Ng, Ying Hui and Sazali, Aiman Syakirin and Lee, Xin Tian and Halimirizal, Muhammad Saiful Hasif and O, Jin Yee and Cheam, Kai Wen (2020) Furniture inventory control: using material requirement planning. In: Material Requirements Planning. Penerbit UTHM, pp. 58-72. ISBN 978-967-2916-53-6

Mohd Nor, Norasmiha and Rahman, Muhammad Syahmi and Mohd Lazim, Nur Azlin and Mohamad Rasul, Nur Hadirah Razi and Abdullah, Nor Fadilah and Rama Rao, Kavita Sai and Cheam, Kai Wen (2020) Material requirements planning application: a case study of dinning table furniture manufacturer. In: Material Requirements Planning. Penerbit UTHM, pp. 73-95. ISBN 978-967-2916-53-6

Cheam, Kai Wen and Mohd Nor, Norasmiha and Taib, Muhammad Aidil and Rahman, Muhammad Saiful Syazuwan and Kor, Wan Xuan and Azman, Ameera Ainur (2020) Material requirements planning system: a case study of stationery manufacturer. In: Material Requirements Planning. Penerbit UTHM, pp. 149-179. ISBN 978-967-2916-53-6

Mohd Nor, Norasmiha and Cheam, Kai Wen and Ser, Eric Jun Hong and Cheng, Yung Tat and Lau, Wee Guan and Rokman, Nor Amira and Radin Abd Rahman, Raden Mohamad Salahuddin (2020) Material requirements planning: application in small medium enterprise. In: Material Requirements Planning. Penerbit UTHM, pp. 115-148. ISBN 978-967-2916-53-6

Cheam, Kai Wen and Mohd Nor, Norasmiha and Shahkirin, Ahmad Haiqal and Jaafar, Muhamad Zamakhsyari and Mhd Zamaludin, Nabilah Afrina and Misnan, Nur Aini Nasihah (2020) Schedule based material requirements planning: a case study of LCD TV manufacturer. In: Material Requirements Planning. Penerbit UTHM, pp. 1-23. ISBN 978-967-2916-53-6

Cheam, Kai Wen and Mohd Nor, Norasmiha and Mohd Noh, Amieruddin Akhmarl and Awang Rosdi, Dayang Nur Qamarina and Roslan, Nor Azwany and Saibi, Noraikah and Saad, Shoib Ali Noor Aldeen (2020) The master production schedule in MRP for microelectronic manufacturer. In: Material Requirements Planning. Penerbit UTHM, pp. 96-114. ISBN 978-967-2916-53-6

Mohd Nor, Norasmiha and Abdul Ghani, Muhammad Hanif and Umar Rashid, Muhammad Aiman Ifqin and Young, Ke Xin and Heng, Chien Ying and Jamzuri, Amelia Yuzni and Cheam, Kai Wen (2020) The material requirements planning system for vacuum manufacturer. In: Material Requirements Planning. Penerbit UTHM, pp. 24-57. ISBN 978-967-2916-53-6

This list was generated on Fri Mar 29 16:50:04 2024 +08.