Items where Subject is "T Technology > TH Building construction > TH5011-5701 Construction by phase of the work (Building trades)"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: A | C | G | H | K | M | O | S | Y
Number of items at this level: 13.

A

Abas, Nor Haslinda and Nurahim, Mohammad Hafiz and Yasin, Norazam and Rahmat, Muhamad Hanafi (2020) Safety incentive program for construction project: case studies of several construction projects in Klang Valley, Malaysia. Civil Engineering and Architecture, 8 (3). pp. 359-365. ISSN 2332-1121

Abd. Rahman, Norashidah (2005) Static strength of tubular DT joints using lusas finite element software. Masters thesis, Universiti Teknologi Malaysia.

Alnadish, Adham and Aman, Mohd. Yusri (2018) Mechanistic approach for reducing the thickness of asphalt layer incorporating steel slag aggregate. Civil Engineering Journal, 4 (2). pp. 334-345. ISSN 2476-3055

Ang, P S E and Pung, Y L and Tsai, K L and Zulkaply, M NA and Tey, J S and Kasim, N B and Osman, M H and Musa, M K and Abdul Rahman, M A (2020) Bim: the setback or solution to project cost issues in Malaysia construction industry? In: 2nd International Conference on Civil & Environmental Engineering.

C

Chin Foo, Lee (2021) Management factors affecting time and cost performance of construction projects. Masters thesis, Universiti Tun Hussein Malaysia.

G

Gambo, M.M. and Gomez, C.P. (2015) Project characteristics for design and build procurement in Malaysian construction industry. Journal of Engineering and Technology, 6 (1). pp. 144-154. ISSN 2180-3811

H

Hasmori, Muhammad Fikri and Said, Ilias and Deraman, Rafikullah and Abas, Nor Haslinda and Nagapan, Sasitharan and Ismail, Mohd Hanif and Khalid, Faisal Sheikh and Roslan, Ahmad Farhan (2018) Significant factors of construction delays among contractors in Klang Valley and its mitigation. International Journal of Integrated Engineering, 10 (2). pp. 32-36. ISSN 2229-838X

K

Kong, H. P. and Yee, Mei Heong and Jailani, Md. Y. and Tee, Tze Kiong and Kok, Boon Ching and Widad, O. (2018) Pembangunan model sistem sanitasi, perparitan dan pembentungan sebagai alat bahan bantu dalam subjek sistem sanitasi, perparitan dan pembentungan. Online Journal for TVET Practitioners (OJ-TP), 3 (2). pp. 77-84. ISSN 2289-7410

M

Mohd Saim, Nur Amylia Izrin (2021) Risk of construction corruption factors in construction project life cycle from contractors’ perspectives. Masters thesis, Universiti Tun Hussein Malaysia.

O

Osman, Yusuf Hussein (2019) Factors affecting cost overrun at construction projects in Somalia. Masters thesis, Universiti Tun Hussein Onn Malaysia.

S

Shaikh, Haseeb Halim (2021) Construction claims in the fast track mega infrastructure projects of Saudi Arabian Construction Industry. Masters thesis, Universiti Tun Hussein Malaysia.

Sohu, Samiullah and Abdullah, Abd Halid and Nagapan, Sasitharan and Ahmed Jhatial, Ashfaque and Tahir, Muhammed (2018) Contributing cost variation factors in highway projects. Civil Engineering Journal, 4 (8). pp. 1793-1798. ISSN 2476-3055

Y

Yahya Al-Tawil, Yahya Mohsen (2019) In-success factor for project management in high-rise building project. Masters thesis, Universiti Tun Hussein Onn Malaysia.

This list was generated on Sun Dec 22 16:20:58 2024 +08.